This is the accessible text file for GAO report number GAO-04-539 
entitled 'Department of Energy: Certain Postretirement Benefits for 
Contractor Employees Are Unfunded and Program Oversight Could Be 
Improved' which was released on April 15, 2004.

This text file was formatted by the U.S. General Accounting Office 
(GAO) to be accessible to users with visual impairments, as part of a 
longer term project to improve GAO products' accessibility. Every 
attempt has been made to maintain the structural and data integrity of 
the original printed product. Accessibility features, such as text 
descriptions of tables, consecutively numbered footnotes placed at the 
end of the file, and the text of agency comment letters, are provided 
but may not exactly duplicate the presentation or format of the printed 
version. The portable document format (PDF) file is an exact electronic 
replica of the printed version. We welcome your feedback. Please E-mail 
your comments regarding the contents or accessibility features of this 
document to Webmaster@gao.gov.

This is a work of the U.S. government and is not subject to copyright 
protection in the United States. It may be reproduced and distributed 
in its entirety without further permission from GAO. Because this work 
may contain copyrighted images or other material, permission from the 
copyright holder may be necessary if you wish to reproduce this 
material separately.

Report to the Chairman, Subcommittee on Energy and Water Development, 
Committee on Appropriations, House of Representatives:

April 2004:

DEPARTMENT OF ENERGY:

Certain Postretirement Benefits for Contractor Employees Are Unfunded 
and Program Oversight Could Be Improved:

GAO-04-539:

GAO Highlights:

Highlights of GAO-04-539, a report to the Chairman, Subcommittee on 
Energy and Water Development, Committee on Appropriations, House of 
Representatives 

Why GAO Did This Study:

The Department of Energy (DOE), which carries out its national 
security, environmental cleanup, and research missions through 
extensive use of contractors, faces significant costs for 
postretirement health and pension benefits for contractor employees. 
Given DOE’s long history of using contractors and the rising cost of 
postretirement benefits, you asked GAO to (1) analyze DOE’s estimated 
financial obligation for postretirement health and pension benefits for 
contractor employees at the end of fiscal year 2003, (2) determine how 
DOE evaluates its contractor postretirement health and pension benefit 
programs and assesses the comparative levels of benefits offered by 
contractors, and (3) assess how DOE’s oversight of these benefits 
could be enhanced. 

What GAO Found:

As of September 30, 2003, DOE reported an estimated $13.4 billion in 
unfunded contractor postretirement health and pension benefits. This 
figure is an estimate of the present value of all benefits attributed 
to employee service before September 30, 2003, minus the fair market 
value of assets dedicated to the payment of retiree benefits. The 
unfunded balance has grown over the past 4 fiscal years as a result of 
the continuing accumulation of benefits, declining interest rates, and 
negative returns on pension assets. A significant portion of the 
unfunded balance relates to benefit programs at contractor sites that 
have already closed or will close once the work is complete. 

DOE Order 350.1 generally provides that contractors periodically 
complete self-assessment studies comparing their benefits to 
professionally recognized measures. DOE uses these studies to make 
decisions about the level of contractor benefits. While the most 
recently completed comparison studies suggest that DOE has been 
successful in offering total contractor benefits that are comparable 
to those of selected competitors, the DOE Order 350.1 studies are not 
performed at a significant number of contractor locations, and 
alternative review procedures performed by DOE personnel are 
inconsistent from one contractor location to another; thus DOE’s 
ability to evaluate the full range of programs is limited. In addition, 
GAO found that a number of the comparison studies did not conform to 
prescribed and recommended methodologies, calling into question the 
validity and comparability of the results.

Moreover, DOE’s current focus on total benefits rather than individual 
benefit components in evaluating benefits does not fully recognize the 
differences in costs between deferred benefit programs, such as pension 
and postretirement health benefits, and other benefit components. This 
distinction is important because changes to pension and postretirement 
health benefits can have a significant impact on DOE’s long-term costs 
and budgetary needs. For example, a 1 percent increase in a contractor 
employee’s current year vacation benefits has less impact on DOE’s 
long-term costs and budgetary needs than a 1 percent increase in 
postretirement pension or health benefits, which have a continuous and 
compounding effect as they are paid out in each year of retirement. 
Although reported total contractor benefits are comparable to selected 
competitors, the postretirement health benefits of DOE contractor 
employees at these sites averaged more than 44 percent greater than the 
average of the contractors’ competitors, while defined benefit pension 
benefits averaged 29 percent greater.

The approval and monitoring of DOE contractor employee pension and 
postretirement health benefits is primarily the responsibility of DOE 
contracting officers, who administer contracts at individual contractor 
locations. Management does not systematically review information 
developed at individual contractor locations to identify best practices 
or areas where benefit comparisons do not adhere to agency requirements 
or guidance. Developing and disseminating this information agencywide 
would enhance DOE’s oversight of contractor employee benefits and 
provide information needed to manage post-closure benefit costs. 

What GAO Recommends:

GAO recommends four executive actions: (1) institute systematic 
management review of pertinent data from each contractor location; (2) 
extend, as practical, DOE comparison study requirements to contractors 
not currently covered by them; (3) where the extension of the order is 
not practical, perform appropriate alternative procedures; and (4) 
incorporate into DOE’s oversight a focus on the long-term costs and 
budgetary implications of decisions pertaining to each component of 
contractor benefit programs. In written comments on a draft of this 
report, DOE agreed with these recommendations.

[End of section]

Contents:

Letter: 

Results in Brief: 

Background: 

Scope and Methodology: 

Reported Unfunded Balances for Contractor Postretirement Benefits Are 
Significant, and Amounts for Post-Closure Benefits Are Increasing: 

Evaluation of Contractor Benefits Could Be Improved: 

Increased Management Review Would Help DOE Oversee Its Contractor 
Employee Benefits Program: 

Conclusions: 

Recommendations for Executive Action: 

Agency Comments and Our Evaluation: 

Appendixes:

Appendix I: DOE Contractor Locations with Pension and Postretirement 
Health Liabilities as of September 30, 2003: 

Appendix II: Comparison of DOE and DOD Contractor Benefit Programs: 

Appendix III: Comments from the Department of Energy: 

Appendix IV: GAO Contact and Staff Acknowledgments: 

GAO Contact: 

Acknowledgments: 

Tables: 

Table 1: Reported Funded Status for DOE Contractor Pension and 
Postretirement Health Benefits at the End of Fiscal Years 1999 through 
2003: 

Table 2: DOE Reimbursements for Contractor Pension Contributions and 
Postretirement Health Payments for Fiscal Years 1999 through 2003: 

Table 3: Summary Statistics for DOE Order 350.1 Benefit Value and Cost 
Comparison Studies (Results Compared to an Average Comparator Index of 
100.0): 

Table 4: Summary Statistics for Total Benefits, Defined Benefit Pension 
Benefits, and Postretirement Health Benefits in DOE Contractor Value 
Studies (Results Compared to an Average Comparator Index of 100.0): 

Table 5: Comparison of DOE and DOD Contractor Benefit Programs: 

Figures: 

Figure 1: Relationship between DOE, Contractors, Third-Party 
Administrators, and Contractor Employees: 

Figure 2: DOE Reimbursements for Postretirement Benefits Sorted by the 
Applicability of DOE Order 350.1 Comparison Studies: 

Letter April 15, 2004:

The Honorable David L. Hobson: 
Chairman, Subcommittee on Energy and Water Development: 
Committee on Appropriations 
House of Representatives:

Dear Mr. Chairman:

The Department of Energy (DOE) carries out its national security, 
environmental cleanup, and scientific and technological innovation 
missions through the extensive use of third-party contractors, 
including universities and private companies. These contractors, in 
many cases, incur costs for pension and postretirement health benefits 
that are reimbursed by DOE under the terms of their contracts. 
Contractor pension and postretirement health benefits represent 
significant costs for both research and environmental cleanup efforts. 
The current methodology used to fund these costs may result in the need 
for DOE to reimburse contractor benefit payments well after current 
operating contracts are terminated or cleanup sites are completed.

We, along with DOE's Office of Inspector General (IG), have issued 
several reports during recent years on the challenges DOE faces in the 
area of contract management and the extent of environmental cleanup 
costs.[Footnote 1] Since 1990, we have included DOE's contract 
management, which is broadly defined to include contract administration 
and project management, as a high-risk area. Given DOE's long history 
of using contractors in its research and cleanup missions and the 
rising cost of providing employee postretirement health benefits, it is 
important that the management of short-term and long-term contractor 
employee benefits obligations ensures both the successful completion of 
cleanup and research objectives and the cost-effective use of 
government resources.

In this context, you requested that we review DOE's contractor employee 
benefits to (1) analyze the department's estimated financial obligation 
for pension and postretirement health benefits for contractor employees 
at the end of fiscal year 2003, (2) determine how DOE evaluates its 
contractor pension and postretirement health benefit programs and 
assesses the comparative levels of benefits offered by its contractors, 
and (3) assess how DOE's oversight of these benefit programs could be 
enhanced.

We conducted our review from July 2003 through February 2004 at the 
Department of Energy headquarters in Washington, D.C., and the Defense 
Contract Audit Agency in Fort Belvoir, Virginia, in accordance with 
generally accepted government auditing standards. We requested written 
comments on a draft of this report from the Secretary of Energy. We 
also requested oral comments on applicable sections of a draft of this 
report from the Secretary of Defense. We incorporated those comments 
into our report as appropriate.

Results in Brief:

As of September 30, 2003, DOE reported an estimated $13.4 billion in 
contractor pension and postretirement health benefits that remain 
unfunded. The unfunded balance, or funded status of these benefits, is 
an estimate of the present value of all benefits attributed to employee 
service rendered prior to September 30, 2003, less the fair market 
value of accumulated assets dedicated to the payment of retiree 
benefits.[Footnote 2] The unfunded balance of these contractor 
benefits has significantly increased over the past 4 fiscal years due 
to the continuing accumulation of accrued benefits and adverse economic 
factors, such as declining interest rates and negative returns on 
pension assets. A significant portion of the unfunded balance relates 
to benefit programs at contractor sites where operations either have 
already been completed or will eventually be completed. The future 
administration and payment of pension and postretirement health retiree 
benefits following site completion creates a number of specific 
challenges for DOE.

DOE Order 350.1 provides that DOE's contractors should periodically 
compare their benefits to those of selected competitors or other 
professionally recognized measures. The most recently completed 
comparison studies report that total contractor benefits are, on 
average, comparable to selected competitors. However, the self-
assessment provisions of DOE Order 350.1 are not applicable to a 
significant number of contractor locations and benefit obligations. 
Also, our review of completed contractor studies reveals a number of 
cases of nonconformance with key DOE procedures, which raises questions 
about the validity of the results of the comparisons.

DOE's oversight of contractor postretirement health and pension 
benefits could be strengthened to provide for greater management review 
of contractor site information and incorporate a focus on the 
anticipated long-term duration of these benefit obligations. The 
absence of systematic management reviews of individual contractor site 
information hinders the agency's ability to conduct programwide 
oversight of contractor benefits and effectively evaluate post-closure 
benefit costs. Moreover, the lack of focus on long-term costs in 
periodic contractor benefit reviews does not fully recognize the 
difference in costs between deferred benefits programs, such as pension 
and postretirement health benefits, and other benefit components. This 
distinction is important because changes to deferred benefits have a 
continuous and compounding effect as they are paid out in each year of 
retirement.

In written comments on a draft of this report, DOE noted that our 
findings were consistent with those of its own internal assessment and 
agreed with the report's four recommendations.

Background:

DOE relies on contractor organizations to manage, operate, maintain, 
and provide support to its environmental cleanup and science and energy 
research at government-owned facilities. Contractors at environmental 
cleanup sites direct remediation efforts for radioactive and hazardous 
waste contamination generated during former nuclear weapons research 
and production activities. The eventual completion of cleanup 
activities at individual contractor locations without the existence of 
other ongoing operations, called site completion or site closure, 
generally leads to transition into long-term stewardship activities 
such as monitoring and surveillance requiring significantly fewer 
resources. Contractors at research sites complete a variety of ongoing 
research and development activities at national laboratories and 
universities.

Contractors at cleanup and research sites may sponsor and pay 
pension[Footnote 3] and postretirement health[Footnote 4] benefits, 
collectively called postretirement benefits, for employees providing 
service under DOE contracts in order to attract, motivate, and retain 
qualified individuals to assist the agency in carrying out its mission. 
Contractors administer postretirement benefits for these employees 
either by establishing separate benefit plans solely for these 
individuals or by arranging for their participation in existing 
corporate plans, where contractor employees at DOE sites and those 
contractor employees assigned to non-DOE work participate in the same 
benefit plans.

DOE reimburses contractor payments for employee compensation, including 
postretirement benefits as authorized by applicable regulations and 
each contractor's operating agreement. For example, the Federal 
Acquisition Regulation (FAR) establishes uniform policies and 
procedures for the acquisition of goods and services by executive 
agencies. The FAR cost principles include factors to be considered by 
an agency when determining whether a contractor-claimed cost is to be 
allowed and reimbursed by an agency. Generally, consideration of 
whether compensation costs incurred under a government contract with a 
commercial organization are allowable includes whether they are, among 
other things, reasonable,[Footnote 5] allocable, and compliant with 
other applicable standards and the terms of the contract. For fiscal 
year 2003, DOE reimbursed approximately $431 million in contractor 
postretirement benefit contributions at 39 different DOE contractor 
sites.[Footnote 6]

Contractor employees qualify for retiree benefits in pension and 
postretirement health plans differently, resulting in different 
methodologies for the payment of the two types of benefits. Pension 
benefits are determined using a formula based on employee salary and 
years of service as specified by contractor plan provisions. Employees 
accrue, or earn, future pension benefits throughout their period of 
service and are generally required to work for a certain period, called 
a vesting period, before they have a right to receive any accrued 
retirement benefits. DOE contractors that offer defined benefit pension 
plans are subject to the minimum funding standards established by the 
Employee Retirement and Income Security Act of 1974 (ERISA).[Footnote 
7]The ERISA requirements set minimum standards regarding how much 
contractors must set aside each year in order to provide for future 
defined benefit pension payments when they are due.

In contrast to contributions for pension benefits, there are no legal 
requirements to fund postretirement health benefits in advance for 
payments to retirees. Therefore, DOE contractors generally pay for 
postretirement health plans on a pay-as-you-go[Footnote 8] basis. 
Retired contractor employees are usually entitled to participate in 
contractor health plans after they complete a period of service 
immediately prior to their retirement. However, unlike pension 
benefits, the future amount of postretirement health benefits earned by 
a contractor employee cannot be expressly defined at the employee's 
retirement date. This is due, in part, to the potential for future 
contractor changes in benefit provisions, such as retiree 
contributions, copayments, and coverage limitations, or cancellation of 
postretirement health coverage.

Figure 1 summarizes the previously discussed relationships between DOE, 
contractors, third-party administrators, and contractor employees in 
the payment, sponsorship, and delivery of postretirement benefits.

Figure 1: Relationship between DOE, Contractors, Third-Party 
Administrators, and Contractor Employees:

[See PDF for image]

[End of figure]

Consistent with the long-term nature of DOE research and cleanup 
activities, it is DOE's policy to provide for the continuation of 
postretirement benefit plans when there are changes in individual 
contractors due to contract competitions. Typically, these scenarios 
would not result in the need for the cancellation and re-creation of 
these benefit plans. Although future contractor employee benefits 
earned may change as a result of contract negotiations, DOE attempts to 
continue the existing benefit plan with the new contractor as the 
sponsor, or offer comparable benefits in a successor contractor benefit 
plan during changes in contractors. Under this scenario, prior 
contractor retirees continue receiving benefits from the new plan 
sponsor and current employees continue to accrue benefits according to 
existing plan provisions.

It is also DOE's policy to facilitate the continuation of 
postretirement benefits following the completion of activities at 
environmental cleanup sites. DOE officials stated that an agency review 
of contracts, benefit plan documents, and labor agreements determined 
that contractor postretirement plans set forth the terms of an exchange 
between the contractor and contractor employees.[Footnote 9] In 
exchange for current services, contractors provide benefits after 
retirement (i.e., monthly pension payments and payments toward 
postretirement health insurance premiums) as defined by the terms of 
the postretirement benefit plans. DOE officials also stated that the 
continuation of pension and postretirement health benefits is necessary 
to reward former contractor employees for prior service at cleanup 
sites and to attract and retain future contractors and contractor 
employees to work at remaining cleanup sites.

The completion of all contractor activities at environmental cleanup 
sites generally results in either the termination of the prime contract 
or a significant reduction in the scope of the outstanding contract. 
These contract changes at site closure differ from a change in 
contractor at an ongoing site because retirees who earned 
postretirement benefits under the terms of prior contracts are left 
without an active contractor to administer future benefit payments. It 
is DOE's policy in these situations that future postretirement benefits 
earned by contractor employees may be satisfied by the outgoing 
contractor in one of two ways. Under the first option, the contractor 
can request reimbursement from DOE for the immediate settlement of 
outstanding benefit obligations, such as through the purchase of 
insurance contracts. Under the second option, the contractor may 
facilitate the continuation of the current benefit program and seek DOE 
reimbursement as postretirement benefit payments are made to retirees. 
The outgoing contractor can achieve the latter option through 
continuing to sponsor current postretirement benefit plans or through 
the transfer of plan administration to another party. This report 
refers to those benefits due and paid after site closure as post-
closure benefits.

In 1996, DOE issued Order 350.1 to establish responsibilities, 
requirements, and further cost allowability criteria for the management 
and oversight of contractor compensation programs.[Footnote 10] The 
order provides that contracting officers are largely responsible for 
the review and approval of allowable contractor compensation costs. It 
also details procedures for the management and oversight of 
postretirement benefits, such as the approval of new postretirement 
benefit plans, the approval of changes made to existing plans, and 
required procedures during contract and postretirement benefit plan 
terminations. The department's Contractor Human Resources Management 
Division (CHRM) is responsible for providing contracting officers with 
policies and procedures for managing contractor postretirement benefits 
costs under the provisions of DOE Order 350.1. DOE's Office of 
Procurement Assistance Management (OPAM) establishes overall 
performance objectives for contractor compensation programs and 
approves changes to pension and postretirement health benefit plans in 
excess of contracting officer authorization limits. The National 
Nuclear Security Administration (NNSA) assumes these responsibilities 
at current naval reactor sites and assists in the review of contractor 
compensation programs at other NNSA-designated locations.

DOE Order 350.1 requires contractors to complete a recurring evaluation 
of their employee benefit programs,[Footnote 11] including pension and 
postretirement health plans, against the benefit programs of labor 
competitors in the private sector or other professionally recognized 
measures.

These provisions are completed to aid contracting officers in assessing 
contractor benefit costs against the reasonableness standards of the 
FAR. Specifically, DOE Order 350.1 states that contractors may use 
either the results from (1) a benefit value study or (2) the annual 
U.S. Chamber of Commerce Employee Benefit Study, collectively called 
comparison studies in this report, to perform an appropriate evaluation 
of their benefit programs.

Benefit value studies are intended to measure the relative worth of a 
contractor's benefit programs to its employees. This is done through 
the calculation of a replacement value[Footnote 12] for the benefits 
offered in the contractor's benefit program. Replacement values that 
may differ among employees, such as the use and extent of current 
employee health benefits, are calculated through the use of a 
hypothetical group of employees. This methodology allows comparisons 
between the provisions of benefit programs with different demographics, 
turnover and retirement rates, and benefit election patterns. As such, 
replacement values are also calculated for selected labor market 
competitors of the contractor and compared to the contractor 
replacement values. DOE contractors engage benefits consulting 
companies to assist with the benefit value studies and work with 
contracting officers to approve the methodologies used.

Replacement values are found for each benefit component evaluated in 
the study and used to develop an overall benefit index program for that 
contractor. The final product of the benefit value study, called the 
net benefit value index, compares the relative value of the 
contractor's employer-paid benefits to the employer-paid value of the 
average labor competitor's benefits, represented by an index of 100. 
Therefore, a contractor with a net benefit value index of 107.0 offers 
benefits to its employees with a replacement value that is 7 percent 
above the average of the contractor's labor competitors. As mentioned, 
the benefit value studies also create separate indexes for major 
individual benefit components, such as pension benefits and vacation 
time.

The U.S. Chamber of Commerce Employee Benefit Study, or Chamber of 
Commerce cost study, provides a comparison of the annual employee 
benefit contributions and payments made by the contractor with the 
average contributions and payments of a survey population. The U.S. 
Chamber of Commerce Employee Benefit Study is an annual polling of 
domestic employers conducted by the U.S. Chamber of Commerce's 
Statistics and Research Center and sponsored by American International 
Group, Inc. The survey publishes information on average employer 
benefit contributions and payments per full-time employee made during 
the preceding year and the percentage of total employer payroll spent 
on employee benefits.

Scope and Methodology:

To analyze the agency's estimated financial liability for contractor 
employee pension and postretirement health obligations, we:

* obtained audited financial reports and disclosures on contractor 
employee postretirement benefit obligations for fiscal years 1999 
through 2003,

* interviewed DOE officials from the Office of Finance and Accounting 
Policy and CHRM regarding the character of obligations at DOE research 
and cleanup sites,

* reviewed actuarial computations of DOE contractor benefit obligations 
to determine how obligations at cleanup sites were adjusted for 
expected site closure dates, and:

* interviewed DOE officials from the Office of Finance and Accounting 
Policy and the Office of General Counsel regarding the agency's 
liability with respect to contractor post-closure benefits.

The calculation of financial liabilities for postretirement benefits 
earned by contractor employees involves the use of significant economic 
and demographic assumptions under the guidance of Statement of 
Financial Accounting Standards (SFAS) No. 87, Employers' Accounting for 
Pensions, and SFAS No. 106, Employers' Accounting for Postretirement 
Benefits Other Than Pensions. It was not our intent to assess, nor did 
we independently assess, the reasonableness of the assumptions used in 
the financial calculations or the accuracy of contractor data used in 
the calculations. For fiscal years 1999 through 2003, DOE's financial 
statements, including estimates of contractor postretirement benefits, 
were audited by either independent public accountants or its IG. For 
each of these years, the auditing entity determined that DOE's 
financial statements presented fairly, in all material respects, the 
financial position of the agency.

To determine how DOE evaluates its contractor postretirement benefit 
programs and compares the benefits offered by DOE contractors with 
private industry benchmarks, we:

* reviewed DOE Order 350.1 and other agency policy and procedure 
guidance related to the completion of contractor comparison studies,

* interviewed DOE officials from CHRM to determine procedures used to 
assess the quality of the contractor comparison studies,

* obtained and analyzed the most recent comparison studies completed by 
DOE contractors for all locations subject to the valuation provisions 
of DOE Order 350.1, and:

* reviewed the most recent comparison studies for all locations subject 
to the DOE Order 350.1 valuation provisions for compliance with DOE 
policies and procedures.

We reviewed contractor comparison studies for compliance with key 
controls in DOE's policies and procedures, designed to provide 
reasonable assurance over the validity of the study results, including 
(1) timely completion and inclusion of major benefit components; (2) 
presence of recommended certifications to attest to the accuracy, 
relevance, and consistency of the data used in the study; (3) 
development of benchmark information through the selection of labor 
competitors and the use of up-to-date data for the competitors 
selected; and (4) calculation of desired (either required or 
recommended) performance measures. We summarized the results of these 
procedures in this report and communicated the detailed results of our 
testing to DOE officials. It was not our intent to verify, nor would we 
have been able to independently verify, the accuracy of actuarial 
calculations, assumptions, or competitor data used in the comparison 
studies due to the proprietary nature of benefits consulting firm 
databases used to conduct the studies. However, we confirmed that DOE 
requirements regarding the completion of these studies by national 
consulting groups with annual consulting revenues in excess of $5 
million were met for all benefit value studies reviewed. We also did 
not independently assess the validity of the data supplied by DOE 
contractors for use in the comparison studies.

To assess DOE's oversight of its contractors' pension and 
postretirement health benefit programs, we:

* reviewed the FAR and other applicable standards related to allowable 
pension and postretirement health costs under contracts with commercial 
organizations;

* determined applicable internal control procedures for DOE's 
contractor benefits program using our Standards for Internal Control in 
the Federal Government[Footnote 13] and Internal Control Management and 
Evaluation Tool;[Footnote 14]

* reviewed related DOE policy and procedure guidance and interviewed 
DOE officials regarding procedures for overseeing contractor benefit 
programs in existence through the end of fiscal year 2003; and:

* reviewed contractor locations subject to the provisions of DOE Order 
350.1 for compliance with DOE policies and procedures related to the 
review of changes to contractor postretirement benefit programs.

In addition, we reviewed contractor operations and the oversight of 
contractor postretirement benefit programs at several federal agencies 
to determine whether contractor benefit programs at these agencies were 
comparable to those at DOE. We determined that the oversight of 
contractor benefit programs at the Department of Defense (DOD) was 
comparable, in some respects, to oversight at DOE and interviewed DOD 
officials to gain an understanding of that agency's procedures and the 
differences between DOE and DOD contractor operations.

Reported Unfunded Balances for Contractor Postretirement Benefits Are 
Significant, and Amounts for Post-Closure Benefits Are Increasing:

In DOE's fiscal year 2003 Performance and Accountability Report, the 
agency reported that the present value of estimated contractor 
postretirement and pension benefits that were unfunded as of 
September 30, 2003, totaled $13.4 billion.[Footnote 15] The unfunded 
balance of these deferred benefits has increased significantly over the 
past 4 fiscal years due to various operating and economic factors. An 
increasing portion of the future unfunded balance will relate to 
estimated pension and postretirement health obligations at completed or 
near-completed environmental cleanup sites. The expected magnitude of 
these benefits at site closure will require DOE to meet significant 
future budgetary and administrative challenges to facilitate the future 
payment of these benefits.

DOE Estimates That the Present Value of Unfunded Contractor 
Postretirement Benefits as of September 30, 2003, Is $13.4 Billion:

DOE reimburses allowable contractor costs for employee postretirement 
benefits and records estimates of these future benefit payments in its 
financial accounting statements.[Footnote 16] The agency reported an 
estimated present value of $13.4 billion for pension and postretirement 
health benefits that have been earned by contractor employees under 
current postretirement benefit plan provisions but were unfunded as of 
September 30, 2003. This figure, also called the funded status, is an 
actuarial[Footnote 17] estimate of future postretirement benefits 
attributed to contractor employee service rendered prior to the 
measurement date less the fair market value of accumulated assets 
dedicated to the payment of the obligation.

The calculation of financial accounting estimates involves the use of 
significant actuarial, demographic, and economic assumptions, 
including, among other things, future interest rates, health care cost 
trends, salary increases, and life expectancies of eligible retirees 
(and their survivors). Also, the estimation is inherently difficult 
because benefits earned by current contractor employees are deferred 
until retirement and the actual payment of these benefits may not occur 
for decades.

Funded Status of Contractor Postretirement Benefits Has Deteriorated 
Significantly since 1999:

The combined funded status for contractor pension and postretirement 
health benefits has changed from a $3.6 billion overfunded position in 
1999 to a $13.4 billion unfunded position in 2003. There are several 
significant reasons for this deterioration in funded status over the 
last 4 fiscal years, including negative pension asset returns, 
declining discount rates[Footnote 18] over the past 3 fiscal years, and 
increasing trends in estimated postretirement health care costs. Table 
1 summarizes the funded status for pension and postretirement health 
benefits for the last 5 fiscal year-ends as reported by DOE.

Table 1: Reported Funded Status for DOE Contractor Pension and 
Postretirement Health Benefits at the End of Fiscal Years 1999 through 
2003:

2003; 
Pension funded status: ($3.7); 
Postretirement health funded status: ($9.7); 
Total funded status: ($13.4).

2002; 
Pension funded status: ($1.0); 
Postretirement health funded status: ($8.3); 
Total funded status: ($9.3).

2001; 
Pension funded status: $5.1[A]; 
Postretirement health funded status: ($6.8); 
Total funded status: ($1.6).

2000; 
Pension funded status: $10.2; 
Postretirement health funded status: ($5.4); 
Total funded status: $4.8.

1999; 
Pension funded status: $8.2; 
Postretirement health funded status: ($4.6); 
Total funded status: $3.6. 

Source: DOE.

Notes: Information from DOE Performance and Accountability Reports for 
fiscal years 1999 through 2003. Numbers may not add to total due to 
rounding. DOE's financial statements for the covered fiscal years were 
audited and received unqualified audit opinions.

[A] A positive funded status indicates an excess of the fair value of 
dedicated assets over estimated benefit obligations.

[End of table]

In general, deterioration in the funded status of postretirement health 
benefits can be attributed to the excess of future benefits earned by 
current contractor employees, known as service costs, plus interest 
costs on outstanding obligations over the payments made to retirees to 
satisfy previously earned benefits. Postretirement health benefit 
service costs plus interest costs have ranged from 2.3 times to 2.5 
times the payments to retirees made in each of the past 5 fiscal years. 
The significant increases in recent retiree health benefit costs, 
decreases in discount rates, and continuing accrual of postretirement 
benefits in existing contractor plans all affect the service and 
interest costs of contractor postretirement health plans, although we 
did not determine to what extent each of these individual factors 
affected the total funded status.

Annual changes in the funded status of pension plans, unlike changes in 
the funded status of postretirement health plans, can be significantly 
affected by returns on dedicated pension assets. Contributions to 
pension plans are generally held in trust for the payment of benefits 
to participants and their beneficiaries. Plan trustees, usually banks 
or trust companies, make investment decisions for the plan with these 
assets. Contractor pension assets have, on average, experienced 
negative returns from 7 percent to 8 percent in each of the past 5 
fiscal years. Negative asset returns decrease the fair market value of 
accumulated pension assets and therefore significantly contribute to 
changes in the funded status of pension benefits.

However, because of current DOE policies, neither the current unfunded 
position nor the significant recent changes in funded status results in 
a requirement for contractors, or DOE, to make any additional annual 
postretirement benefit contributions. DOE Order 350.1 provides that in 
general, annual contractor contributions for pension benefits shall not 
exceed the minimum contribution required by ERISA. The order also 
provides that postretirement health benefits are paid using a pay-as-
you-go method unless otherwise required by state or federal statute. 
See table 2 for pension contributions and postretirement health 
payments reimbursed by DOE over the last 5 fiscal years.

Table 2: DOE Reimbursements for Contractor Pension Contributions and 
Postretirement Health Payments for Fiscal Years 1999 through 2003:

Dollars in millions: 

2003; 
Pension contributions: $167; 
Postretirement health payments: $264; 
Total contributions and payments: $431.

2002; 
Pension contributions: $75; 
Postretirement health payments: $243; 
Total contributions and payments: $318.

2001; 
Pension contributions: $43; 
Postretirement health payments: $226; 
Total contributions and payments: $269.

2000; 
Pension contributions: $58; 
Postretirement health payments: $205; 
Total contributions and payments: $263.

1999; 
Pension contributions: $61; 
Postretirement health payments: $181; 
Total contributions and payments: $242. 

Source: DOE.

Note: Information from DOE Performance and Accountability Reports for 
fiscal years 1999 through 2003.

[End of table]

However, certain contractors may face higher short-term pension 
contributions because minimum contributions calculated under ERISA 
rules factor in both current service costs and outstanding 
obligations.[Footnote 19] In any case, the reported $13.4 billion 
unfunded balance will, eventually, require additional contributions, 
investment gains, or favorable benefit experience[Footnote 20] within 
existing pension and postretirement health plans in order to satisfy 
future benefits when they come due.

Post-Closure Benefit Obligations Will Increase with Continuing 
Environmental Site Closures:

While DOE fiscal year 2003 reimbursements of postretirement benefits to 
contractors administering benefits following site closure totaled only 
approximately $6 million, future amounts will significantly increase 
with continuing environmental site closures. DOE has indicated that the 
agency is scheduled to close several environmental cleanup sites within 
the next few years. Contractor employee postretirement benefits at 
these sites had total unfunded balances in excess of $1.5 billion as of 
September 30, 2003.

DOE Order 350.1 provides that when operations at a DOE facility are 
terminated and no further work is to be completed, pension and 
postretirement health benefit continuation will be provided for those 
contractor employees who earned retirement benefits in these plans. 
Consistent with DOE Order 350.1, contract language at anticipated 
closure sites (such as Fernald and Rocky Flats) indicates that the DOE 
contracting officer will designate and communicate the method of 
benefit continuation within the final 6 months of the contract and may 
direct any of a number of potential means of doing so, including, but 
not limited to, (1) termination and settlement of the plans in 
accordance with relevant laws and regulations, (2) continuation of the 
plans on a pay-as-you-go basis under a separate contract with the 
contractor, or (3) transfer of plan responsibilities to another 
contractor or third party.

In conjunction with a site closure, the contractor may submit a claim, 
called a settlement proposal, for the final calculation of estimated 
postretirement benefits earned by contractor employees. The 
reimbursement of these costs would allow the contractor, generally 
through the purchase of insurance contracts, to complete the payment of 
future pension and postretirement health benefits without further DOE 
reimbursement. The ability of DOE to honor these claims largely depends 
on DOE's available financial resources compared to the total settlement 
costs[Footnote 21] involved in the satisfaction of outstanding 
postretirement benefits.

According to DOE officials, DOE has recently considered several options 
to avoid postretirement benefit settlements because the reimbursement 
of contractors for the purchase of annuity contracts and future health 
benefit payments involves significant costs above the calculated 
settlement amount. Because of the budgetary resources required to 
settle postretirement benefits at completed cleanup sites, DOE 
officials anticipate continuing the annual reimbursement of benefit 
payments by extending contracts with cleanup site contractors in some 
cases, solely to administer the benefits, thereby preserving the 
contractor relationship as the plan sponsor. The continuation of these 
benefits creates specific challenges for DOE, including the following:

* DOE currently attempts to pass the administrative responsibilities 
for the continuation of post-closure employee benefits to existing 
contractors. However, as the number of contractors with existing 
cleanup operations diminishes with additional site closures, DOE must 
either continue relationships with former contractors, many of which 
were created only to facilitate a site closure, or transfer 
responsibilities to another party.

* Even though contractor postretirement benefits are earned during 
previous employment periods, DOE will require continuing appropriations 
in order to reimburse contractors for the payment of postretirement 
benefits to former contractor retirees and other beneficiaries. DOE 
officials estimate that the post-closure obligations may extend through 
2075.

* The continuation of postretirement benefits through another 
contractor or a third party requires DOE to pay for the allowable 
administrative expenses of these activities.

* The continuation of postretirement benefits requires DOE to monitor 
and evaluate the ongoing contractor reimbursement for post-closure 
benefit payments and any changes in those benefit programs made by the 
contractor.

In response to these challenges, DOE announced plans in 2003 to 
establish an Office of Legacy Management to address the long-term 
management of former cleanup site contractor obligations. According to 
agency officials, a key mission of the Office of Legacy Management is 
to ensure the quality of service and continuity of former contractor 
employees' pension and medical benefits. The office is planning a 
comprehensive approach to fulfill the agency's pension and 
postretirement health obligations at current and future closure sites.

Evaluation of Contractor Benefits Could Be Improved:

DOE Order 350.1 generally requires that contractors periodically 
complete self-assessments of major nonstatutory benefit programs 
against professionally recognized measures. The most recent contractor 
comparison studies report average contractor benefits are 0.2 percent 
below the value of selected labor competitors. However, a significant 
number of contractor locations are not subject to the valuation 
provisions of DOE Order 350.1, or otherwise do not complete them. In 
cases where DOE Order 350.1 does not apply, alternative procedures are 
performed by DOE personnel; however, the procedures are inconsistent 
among contractor locations and are limited at completed, or near-
completed, cleanup sites. We also found the comparison studies that 
were completed under DOE Order 350.1 often did not conform to existing 
DOE policies and recommended procedures.

Evaluation Studies Report Contractor Benefits Are Comparable to Those 
Offered by Selected Competitors:

Each DOE contractor subject to the self-assessment provisions of DOE 
Order 350.1 is to periodically complete a comparison study evaluating 
its benefit programs against external benchmarks. This evaluation of 
contractor benefits may take the form of either a benefit value study, 
which measures relative replacement cost of employer-paid benefits 
against the benefits offered by a group of selected labor competitors, 
or a cost study, which measures the annual relative per capita benefit 
cost against companies surveyed by U.S Chamber of Commerce. The results 
of the comparison studies allow DOE contracting officers to measure the 
competitiveness of contractor benefit programs in the labor market and 
to assess contractor benefit program costs for reasonableness under 
applicable regulations and contract provisions. Table 3 summarizes the 
reported results from the most recent contractor comparison studies 
completed.

Table 3: Summary Statistics for DOE Order 350.1 Benefit Value and Cost 
Comparison Studies (Results Compared to an Average Comparator Index of 
100.0):

Comparison study measures: Average; 
Total benefits index: 99.8.

Comparison study measures: Maximum; 
Total benefits index: 148.0.

Comparison study measures: Minimum; 
Total benefits index: 71.0.

Comparison study measures: Number of sites with an index above 105[A]; 
Total benefits index: 5.

Comparison study measures: Number of sites with an index from 90 to 
110; 
Total benefits index: 16.

Source: GAO analysis.

Notes: Summarizes most recent contractor benefit value and Chamber of 
Commerce cost studies submitted by 21 DOE contractors. Generally, DOE 
benefit value study indexes should not be used to compare benefit 
program values between contractor sites because each study uses 
different comparator firms, each study completes the study as of a 
different date, and assumptions and methodologies may vary among 
contractor locations. However, the comparison study results are useful 
as performance indicators of how contractor benefits compare to a 
similarly determined value, the average benefit value of a selected set 
of labor competitors.

[A] DOE's goal is for the reported contractor benefit value to be no 
higher than 105 (or 5 percent higher than the average value of the 
contractor competitors at each location).

[End of table]

The reported results of the contractor comparison studies suggest that 
DOE has been fairly successful in achieving its goal of limiting the 
total value of contractor benefits to no more 5 percent higher than the 
average total value of the contractor's labor competitors at each 
location. As shown in table 3, only 5 of 21 studies have a benefits 
value of more than 105 and the average contractor benefits value is 0.2 
percent below the employer-paid benefits level of selected study 
competitors. The reported results range from 29 percent below 
competitor averages to 48 percent above those averages; however, at 16 
of 21 contractor locations, the reported benefits value falls from 90 
to 110, or 10 percent below to 10 percent above labor competitor 
averages. As discussed later in this report, contractor nonconformance 
with DOE guidance on the completion of these studies raises questions 
about the validity of the comparison study results.

A Significant Number of Contractors Do Not Complete DOE Order 350.1 
Comparison Studies:

A significant number of DOE contractors, and the postretirement 
benefits they offer, are not subject to the comparison study provisions 
of DOE Order 350.1. Contractors with postretirement benefits (1) 
offered in corporate plans,[Footnote 22] (2) reimbursed under support 
contracts,[Footnote 23] and (3) provided for employees at naval reactor 
sites are exempted from the requirements. In addition, the studies were 
not performed at six contractor sites that were closed, or nearing 
completion.

DOE reimbursements of postretirement benefits at sites at which 
comparison studies were not completed accounted for $105 million of the 
$431 million, or 24 percent, in total contractor contributions made for 
contractor postretirement benefit programs in fiscal year 2003. Figure 
2 illustrates DOE reimbursements for postretirement benefits made for 
fiscal year 2003 according to whether the contractor location is 
subject to the comparison study provisions and the reasons DOE 
officials provided for their exclusion.

Figure 2: DOE Reimbursements for Postretirement Benefits Sorted by the 
Applicability of DOE Order 350.1 Comparison Studies:

[See PDF for image]

Note: Based on information provided by DOE and data in its fiscal year 
2003 audited financial statements.

[End of figure]

DOE officials complete alternative monitoring procedures at some 
locations where DOE Order 350.1 comparison studies are not required or 
otherwise completed. Examples of these procedures include reviews of 
benefit payment invoices, comparisons to other DOE contractor programs, 
and review of annual actuarial calculations. CHRM also periodically 
completes valuation and cost reviews at various contractor sites. CHRM 
procedures include reviews of contractors' actual incurred costs for 
benefits and wages; actuarial valuation and accounting reports; and 
various annual pension plan reviews, such as salary replacement, plan 
investment, and cash flow requirement analysis.

However, at completed or near-completed cleanup sites we found that DOE 
officials did not complete comparison studies and completed limited 
alternative procedures to assess the reasonableness of continuing 
pension and postretirement health payments at these locations. 
According to DOE officials, significant reasons for the absence of 
comparison studies for post-closure benefits include the lack of 
resources to perform the studies at former contractor sites that are 
nearing completion and the fact that three DOE sites were closed before 
the provisions of DOE Order 350.1 became applicable. Reimbursements at 
these locations in fiscal year 2003 totaled $31 million and, as 
previously mentioned, the postretirement benefits paid at closed 
locations are anticipated to increase as additional closure sites are 
completed.

Nonconformance with DOE Guidance Raises Questions about the Validity of 
Comparison Study Results:

DOE Order 350.1 requires certain processes and procedures for 
completing the previously discussed comparison studies. In addition, 
DOE's Value Study Desk Manual[Footnote 24] describes recommended 
methodologies for the completion of a benefit value study. 
Collectively, the procedures and methodology outlined in DOE Order 
350.1 and the Value Study Desk Manual are intended to provide 
reasonable assurance that the comparison studies result in valid, 
reliable, and comparable information regarding the benefits offered by 
DOE contractors. To assess the studies completed by DOE contractors, we 
selected 12 significant provisions from DOE Order 350.1 and the Value 
Study Desk Manual and reviewed the most recently completed contractor 
studies for conformance with these provisions. Our review encompassed 
all 21 contractor sites subject to the comparison study provisions of 
DOE Order 350.1 (18 completed benefit value studies and 3 completed 
Chamber of Commerce cost studies).

Based on our review of the studies performed at contractor sites 
subject to the valuation provisions of DOE Order 350.1 and the Value 
Study Desk Manual, we found one or more instances of nonconformance 
with required or recommended comparison study procedures at 18 of the 
21 contractor sites. In summary, we found instances of nonconformance 
with guidance in the following areas:

* Contractors did not follow applicable provisions for selecting and 
documenting comparators used in the development of a benefit value 
index (11 of 18[Footnote 25] sites completing benefit value studies).

* Contractors did not use the recommended methodologies to calculate 
the results of the comparison study (10 of 21 sites completing benefit 
value or cost studies).

* Contracting officers did not obtain recommended certifications from 
contractors and actuarial consultants to verify data used in the 
benefit value studies (16 of 18[Footnote 26] sites completing benefit 
value studies).

Since the results of the benefit value comparison studies are sensitive 
to the selection of a comparator group, DOE Order 350.1 and the Value 
Study Desk Manual provide that the comparator group include at least 15 
participants, only 20 percent of which can be other DOE contractor 
sites that compete for professional level staff. Our review determined 
that 11 out of 18 contractors did not properly select comparator firms 
or maintain documentation on comparators in accordance with recommended 
procedures in the Value Study Desk Manual.[Footnote 27] Although DOE 
policies also require contracting officers to review and approve the 
contractor comparator group prior to the completion of the benefit 
value study, several contractors were not in compliance with this 
agency procedure because they did not provide the specific 
documentation recommended by the Value Study Desk Manual. This 
situation may result in inconsistent criteria selection for comparators 
among contractor studies.

DOE Order 350.1 requires contractor comparison studies to generate 
appropriate comparison statistics. The Value Study Desk Manual 
recommends that benefit value studies calculate the contractor's total 
employer-paid net benefit value using a comparison to the average total 
(e.g., the mean) net benefit value for the comparator group. DOE Order 
350.1 requires Chamber of Commerce cost studies to calculate the 
contractor's actual per capita benefits cost per employee compared to 
the most recently published survey from the same benefit year. Our 
review found that 10 out of the 21 contractor sites did not calculate 
the desired performance measure as required or recommended by DOE 
guidance. In several cases, we found that the contractor total benefit 
value index was computed based on the median, not the mean, of 
competitor replacement values. We also found that separate performance 
measures were presented for employee groups with tiered benefits 
without any indication of the total cost distribution between the 
groups. The failure to calculate consistent comparison study results 
makes it difficult for agency officials to compare results among sites 
and correctly determine whether corrective action plans are required.

The Value Study Desk Manual also recommends that the assigned 
contracting officers obtain certifications from both the contractor and 
the benefits consulting group performing the comparison studies to 
verify the accuracy, consistency, and validity of comparisons 
completed. The certifications are key controls over the quality of the 
studies. For example, they would alert contracting officers if the 
contractor was to change comparator firms or valuation methodologies 
and assumptions or was unable to obtain up-to-date competitor benefit 
data. Our review determined that 16 out of 18 contractors that 
completed a benefit value study did not submit the contractor and 
actuarial certifications at the completion of the study. The absence of 
these certifications can result in the improper interpretation of the 
comparison study results by contracting officers.

Increased Management Review Would Help DOE Oversee Its Contractor 
Employee Benefits Program:

DOE could enhance its oversight of contractor employee benefits and 
address the challenges posed by the future administration of 
significant post-closure benefits by providing for greater management 
review of information developed at individual contractor sites and 
incorporating a focus on the long-term nature of pension and 
postretirement health benefits. The limited review of post-closure 
benefit payments completed by contracting officers at closed sites may 
make the continued decentralization of benefit program monitoring 
impractical. Also, the 70-year anticipated duration for some DOE 
reimbursements of contractor employee pension and postretirement health 
costs earned to date needs additional consideration in DOE's 
evaluations of contractor benefit costs.

DOE contracting officers are primarily responsible for determining the 
allowability of DOE contractor employee benefit costs and administering 
the benefits. Accordingly, DOE's current monitoring and risk assessment 
process is largely performed by contracting officers who are 
responsible for reviewing benefit programs at one contractor site. 
Contracting officers have the ability to seek technical advice and 
policy support from various DOE resources, including CHRM, OPAM, and 
NNSA. DOE also maintains a Memorandum of Understanding with DOD agency 
offices to provide audit services. These management offices offer, as 
needed or requested, various issue-or location-specific monitoring 
activities; however, they do not routinely review the results of the 
monitoring and risk assessment activities of the contracting officers. 
Thus, agencywide information regarding nonconformance with guidelines 
for contractor employee benefit program assessments is not routinely 
analyzed by management so that corrective actions can be taken. 
Similarly, best practices are not routinely identified at individual 
contractor sites and propagated across the agency.

Also, dissimilarities in benefit programs between contractor locations 
can lead to adverse situations for the contractor benefits program as a 
whole. DOE recently approved proposals submitted by contractor employee 
groups at two DOE sites to enhance each group's pension benefits so 
they would be comparable with the pension benefits at another DOE site. 
The agency approved these benefit enhancements largely based on the 
argument that doing so would retain skilled staff, even though the most 
recent contractor benefit value studies indicated that these sites 
already had pension and postretirement health benefit replacement 
values exceeding average labor competitor programs.

The fact that some sites have closed, and others are nearing 
completion, also suggests the need for more management attention to 
program reviews. We found that contracting officers at several closed, 
or near-completed, environmental sites did not perform comparison 
studies under the provisions of DOE Order 350.1 or complete other 
substantive monitoring procedures. The failure to do so was attributed 
to a lack of resources. We believe that transitioning these monitoring 
and risk assessment procedures to a management level that will still 
exist after site closure would better position DOE to address future 
challenges. Systematic monitoring reviews and risk assessments will be 
necessary for post-closure benefits since DOE officials contend that 
(1) current contractor pension and postretirement health plan 
provisions allow for changes in postretirement benefits subsequent to 
the site closure and (2) post-closure benefit payments remain subject 
to compliance with DOE's guidance for comparison studies and applicable 
regulations, such as the cost reasonableness provisions of the FAR.

Although the agency resources required to monitor DOD's contractor 
benefits program are significantly greater than those needed at 
DOE,[Footnote 28] the organizational structure at DOD provides an 
example of an oversight group used to assist in compliance reviews and 
risk assessment at all contractor locations. DOD provides contracting 
officers significant operational support from the Defense Contract 
Audit Agency (DCAA) and the Defense Contract Management Agency (DCMA). 
The two agencies provide a consistent source of routine review and 
analysis of detailed benefit and cost information outside of individual 
contractor locations. This group is thus able to gain broad knowledge 
of contractor issues and decisions to apply a more consistent 
definition of reasonableness to the evaluation of contractor benefit 
costs. DOD also has formal guidance within the agency's supplement to 
the FAR,[Footnote 29] which lists occurrences in postretirement health 
or pension programs that indicate heightened risk and should lead a 
contracting officer to request a separate in-depth evaluation of the 
policies, practices, and costs of a contractor benefit component that 
is performed jointly by DCAA and DCMA staff.

DOE's evaluation of total benefits in the benefit value study rather 
than a review of the individual benefit components does not fully 
address the differences in costs between deferred benefit programs, 
such as pension and postretirement health benefits, and other benefit 
components. A management focus on the long-term impacts of contractor 
benefit program decisions may provide improved information for decision 
makers in DOE and Congress. This information is important because 
decisions on changes to pension and postretirement health benefits can 
have a significant impact on DOE's long-term budgetary needs. For 
example, a 1 percent increase in a contractor employee's current year 
vacation benefits has less impact on DOE's long-term costs and 
budgetary needs than a 1 percent increase in postretirement pension or 
health benefits, which have a continuous and compounding effect as they 
are paid out in each year of retirement. Nevertheless, DOE contracting 
officers decide whether corrective action plans are needed largely 
based on the review of the total benefit value index, which does not 
take into account the differences between the total cost of pension and 
postretirement health benefits and other benefit components. These cost 
differences may be significant because pension and postretirement 
health benefits can require DOE reimbursement long after an employee 
retires.

As shown in table 4, the benefit value indexes for contractors' pension 
and postretirement health benefits are significantly different from the 
total benefits indexes shown in table 3. Both the pension and 
postretirement health benefit indexes have larger programwide averages, 
larger index ranges, and more contractors with benefit indexes outside 
of DOE's target range of 5 percent above the average of selected 
competitors. For example, postretirement health benefits average more 
than 44 percent greater than the average of the DOE contractors' 
competitors, while defined benefit pensions average 29 percent greater.

Table 4: Summary Statistics for Total Benefits, Defined Benefit Pension 
Benefits, and Postretirement Health Benefits in DOE Contractor Value 
Studies (Results Compared to an Average Comparator Index of 100.0):

Comparison study measures: Average; 
Total benefits index: 99.8; 
Defined benefit pension index: 129.0; 
Postretirement health index: 144.8.

Comparison study measures: Maximum; 
Total benefits index: 148.0; 
Defined benefit pension index: 261.2; 
Postretirement health index: 737.0.

Comparison study measures: Minimum; 
Total benefits index: 71.0; 
Defined benefit pension index: 75.0; 
Postretirement health index: 18.6.

Comparison study measures: Number of sites with an index above 105; 
Total benefits index: 5; 
Defined benefit pension index: 11; 
Postretirement health index: 9.

Comparison study measures: Number of sites with an index from 90 to 
110; 
Total benefits index: 16; 
Defined benefit pension index: 2; 
Postretirement health index: 2. 

Source: GAO analysis.

Note: Summarizes the most recent contractor benefit value studies 
submitted by DOE contractors.

[End of table]

In addition, DOE's review of current pension contributions and 
postretirement health payments through the Chamber of Commerce cost 
studies completed by three contractor sites is not consistent with the 
long-term nature of pension and postretirement health benefits. This 
inconsistency is largely due to the fact that annual employer 
contributions for pension and health benefits generally do not equal 
the estimated amount of postretirement benefits earned by current 
employees that year, also called the annual service cost of benefits. 
For example, DOE reimbursed $430 million in costs to its contractors 
for pension and health plan contributions in fiscal year 2003; however, 
the reported fiscal year 2003 service cost of those plans was $872 
million.[Footnote 30]

It is DOE's policy to evaluate contractor requests for changes to 
existing pension and postretirement health plans by reviewing total 
benefit values and annual contributions, rather than total costs. DOE 
Order 350.1 requires contractors to submit proposed changes to 
contractor postretirement benefit programs with information on the 
impact of the changes on existing comparison studies and anticipated 
changes in cost. However, the order does not differentiate the annual 
contractor contribution cost from the total future cost of the changes. 
For example, the determination to accept proposed changes by one 
contractor noted that the increase in pension liabilities caused by the 
changes would not result in additional short-term reimbursements by DOE 
due to the positive funded status of the plan. Furthermore, our review 
of changes made to contractor postretirement benefit plans during 
fiscal year 2002 revealed that 3 out of 11 contractors that submitted 
changes to DOE for approval did not include either the effect of the 
plan changes on comparison study results or an estimate of savings or 
costs.

Conclusions:

The satisfaction of postretirement contractor benefits earned under 
current and prior contracts with the government will require 
significant amounts of budgetary and administrative resources to pay 
and monitor the payment of these benefits long after current research 
contracts and cleanup sites are terminated. Because DOE has excluded 
certain contractor locations from a requirement to complete periodic 
benefit valuation studies, it cannot apply a consistent evaluation of 
costs for all benefit programs. Within programs required to complete 
comparison studies, instances of contractor nonconformance with 
policies and guidance make the results difficult to interpret and use 
in making management decisions regarding the level of program benefits. 
The challenges associated with administering post-closure benefits and 
a lack of focus on the long-term nature of postretirement pension and 
health benefit obligations exacerbate these problems. Formal management 
reviews that attempt to identify and correct areas of nonconformance, 
propagate best practices agencywide, and focus on long-term budgetary 
needs could improve DOE's oversight of the contractor employee 
postretirement benefits program.

Recommendations for Executive Action:

GAO recommends that the Secretary of Energy take the following four 
executive actions:

1. Institute systematic management review of pertinent data from each 
contractor location to enhance the consistency of benefit program 
evaluations and reduce the instances of nonconformance with the 
requirements of DOE Order 350.1 and other recommended procedures. The 
intent of the management review would be to correct areas of 
nonconformance, identify best practices, and disseminate this 
information across the agency.

2. Extend the comparison study requirements of DOE Order 350.1, to the 
extent practical, to all contractor locations with benefit obligations 
to provide better information about programwide contractor employee 
benefit costs.

3. In cases where the extension of the order is not practical, develop 
and perform appropriate alternative procedures to provide similar 
information.

4. Incorporate into DOE's oversight process a focus on the long-term 
costs and budgetary implications of decisions pertaining to each 
component of contractor benefit programs, especially pension and 
postretirement health benefits, that have budgetary requirements beyond 
the current year. This would augment the current consideration of total 
annual benefit costs.

Agency Comments and Our Evaluation:

We requested and received from DOE written comments on a draft of this 
report, which are reprinted in appendix III. In its comment letter, DOE 
noted that our findings were consistent with those of its own internal 
assessment and agreed with the report's four recommendations. DOE also 
provided us with technical comments, which we have incorporated as 
appropriate.

Additionally, we requested oral comments from DOD on applicable report 
excerpts. DOD did not have any comments on the report.

We are sending copies of this report to appropriate House and Senate 
committees; the Secretary of Energy; and the Director of the Office of 
Management and Budget. We will also make copies available to others 
upon request. The report is also available at no charge on GAO's Web 
site at [Hyperlink, http://www.gao.gov]. If you have any questions 
about this report, please contact me at (202) 512-6131. You may reach 
me by e-mail at [Hyperlink, martinr@gao.gov]. Contributors to this 
report are listed in appendix IV.

Sincerely yours,

Signed by:

Robert E. Martin: 
Acting Director Financial Management and Assurance:

[End of section]

Appendixes: 

[End of section]

Appendix I: DOE Contractor Locations with Pension and Postretirement 
Health Liabilities as of September 30, 2003:

Contractor site:

Ames Laboratory; 
Argonne National Laboratory; 
Bettis Atomic Power Laboratory; 
Brookhaven National Laboratory; 
Civilian Radioactive Waste Management Program (Yucca Mountain 
Project); 
Fermi National Accelerator Laboratory; 
Fernald Environmental Management Project; 
General Electric Vallecitos Nuclear Center; 
Grand Junction Sites; 
Hanford Site; 
Hanford Site - Hanford Environmental Health Foundation; 
Idaho National Engineering and Environmental Laboratory; 
Kansas City Plant; 
Knolls Atomic Power Laboratory; 
Lawrence Berkeley National Laboratory; 
Lawrence Livermore National Laboratory; 
Los Alamos National Laboratory; 
Miamisburg Environmental Management Project (Mound Plant); 
National Renewable Energy Laboratory; 
Nevada Test Site/Naval Petroleum Reserves[Footnote 31]; 
Nevada Test Site - Security Services; 
Oak Ridge/Paducah and Portsmouth Gaseous Diffusion Plants; 
Oak Ridge Y-12 Site; 
Oak Ridge Associated Universities/Oak Ridge Institute for Science and 
Education; 
Oak Ridge National Laboratory; 
Oak Ridge - Security Services; 
Pacific Northwest National Laboratory; 
Pantex Plant; 
Pinellas Plant; 
Portsmouth Gaseous Diffusion Plant[Footnote 32]; 
Princeton Plasma Physics Laboratory; 
Rocky Flats Environmental Technology Site/Rocky Flats Security 
Services[Footnote 33]; 
Sandia National Laboratory; 
Savannah River Site; 
Savannah River Site - Security Services; 
Stanford Linear Accelerator Center; 
Thomas Jefferson National Accelerator Facility; 
Waste Isolation Pilot Plant; 
West Valley Demonstration Project.

[End of section]

Appendix II: Comparison of DOE and DOD Contractor Benefit Programs:

Both DOE and DOD manage a large number of individual contracts and 
contractor operations. Both agencies also allow for the reimbursement 
of annual pension and postretirement health costs and have agency 
contracting officers who are responsible for reviewing these costs for 
compliance with applicable regulations. However, as shown in table 5, 
there are some underlying program differences that have an impact on 
the way the two agencies manage their contractor benefits.

Table 5: Comparison of DOE and DOD Contractor Benefit Programs:

Program area: Ownership of operations facilities; 
DOE: Employees receiving benefits are at government-owned facilities; 
DOD: Majority of employees receiving benefits are at contractor-owned 
facilities.

Program area: Duration of contractor/site mission; 
DOE: Long-term relationships, for example, completion of environmental 
cleanup tasks and ongoing research missions; 
DOD: Mostly short-term relationships, for example, construction of 
military equipment.

Program area: Separation of operation employee benefits from other 
contractor employee programs; 
DOE: Majority of plans are for DOE contract benefits only; 
corporate plans require separate benefits calculations for reporting 
purposes; 
DOD: Employees continue to participate in existing contractor corporate 
plans.

Program area: Involvement in contractor establishment and changes to 
existing contractor employee benefit programs; 
DOE: Contracting officers are involved in the initial approvals of 
contractor benefit programs and subsequent changes to those programs; 
DOD: Contractor is usually free to structure and make changes to plans, 
but resulting costs are subject to review for allowability.

Program area: Segregation of operation contractor employees from other 
contractor operations; 
DOE: DOE contractor employees generally do not split time between DOE 
and non-DOE work; 
DOD: DOD contractor employees often work on DOD and other contracts 
concurrently.

Program area: Extent of post-closure benefit obligations and 
applicability of Cost Accounting Standards; 
(CAS)[A]; 
DOE: DOE policies allow for contractor continuance of benefit programs 
for employees who earned benefits under former contracts.[B]; 
DOD: DOD generally settles obligations according to CAS provisions 
after the contractor ceases to perform under the contract. 

Source: GAO analysis of DOE and DOD data.

[A] Section 26 of the Office of Federal Procurement Policy Act, as 
amended, 41 U.S.C. § 422 (2000), requires certain contractors and 
subcontractors to comply with CAS, as issued by the Cost Accounting 
Standards Board. These standards are mandatory for use by all executive 
agencies and by contractors in estimating, accumulating, and reporting 
costs in connection with negotiated prime contract and subcontract 
procurements with the government in excess of $500,000, other than 
contracts or subcontracts that have been exempted by regulations.

[B] According to a DOE official, compliance with CAS standards related 
to accounting for pension costs is not mandatory under DOE management 
and operating or support services contracts.

[End of table]

[End of section]

Appendix III: Comments from the Department of Energy:

Department of Energy 
Washington, DC 20585 
APR 05 2004:

Mr. Jeffrey C. Steinhoff 
Managing Director 
Financial Management and Assurance 
U.S. General Accounting Office 
Washington, D.C. 20548:

Dear Mr. Steinhoff:

We appreciate the General Accounting Office (GAO) comprehensive review 
of the Department of Energy (DOE) financial obligations for 
postretirement health and pension benefits for contractor employees and 
the assessment of how Departmental oversight of these benefit programs 
could be enhanced. Contractor pension and postretirement health 
benefits represent significant costs under DOE major facility 
management contracts but, unlike pension benefits, there are no tax 
favorable vehicles to prefund retiree medical benefits. In addition, 
medical cost inflation has continued to increase, causing enduring cost 
escalation in otherwise reasonable contractor medical benefit plans.

While we agree with the four GAO recommendations, we have enclosed 
detailed comments on your draft report, Certain Postretirement Benefits 
for Contractor Employees are Unfunded and Program Oversight Could Be 
Improved (GAO-04-539). Our comments either clarify the Department's 
position or note factual errors. We are please to note that the GAO 
findings were consistent with the conclusions of a DOE internal 
assessment which was completed in September 2003, and that the GAO 
recommendations appear to support the corrective actions already 
underway as part of the Fiscal Year 2004 Balanced Scorecard Performance 
Assessment Program.

The DOE internal assessment identified Department oversight of 
Contractor Human Resource costs as a significant area of concern. The 
DOE conclusion that "...appropriate oversight of contractor 
compensation cost, long term pension, and retiree medical liabilities 
is necessary for programmatic financial planning..." mirrors the GAO 
concerns for long-term liabilities associated with post closure pension 
and health benefits.

We believe that completion of these management initiatives will result 
in more consistent implementation of DOE contractor compensation and 
benefit acquisition policy. The Department would be pleased to provide 
any additional information that is desired in this matter.

Sincerely,

Signed by: 

James T. Campbell:

Acting Director, Office of Management, Budget and Evaluation/Acting 
Chief Financial Officer:

[End of section]

Appendix IV: GAO Contact and Staff Acknowledgments:

GAO Contact:

Robert E. Martin, (202) 512-6131:

Acknowledgments:

In addition to the individual named above, Sharon Byrd, Richard 
Cambosos, Lisa Crye, Frederick Evans, Darren Goode, Roger Thomas, and 
Scott Wrightson made key contributions to this report.

(190096):


FOOTNOTES

[1] U.S. General Accounting Office, Major Management Challenges and 
Program Risks: Department of Energy, GAO-03-100 (Washington, D.C.: 
January 2003), and Contract Reform: DOE Has Made Progress, but Actions 
Needed to Ensure Initiatives Have Improved Results, GAO-02-798 
(Washington, D.C.: Sept. 13, 2002). U.S. Department of Energy, Office 
of Inspector General, Management Challenges at the Department of 
Energy, DOE/IG-0626 (Washington, D.C.: November 2003).

[2] DOE calculates the funded status of its postretirement health and 
pension benefits in accordance with the accounting methodology and 
assumptions prescribed in Statement of Financial Accounting Standards 
(SFAS) No. 87, Employers' Accounting for Pensions, and SFAS No. 106, 
Employers' Accounting for Postretirement Benefits Other Than Pensions, 
as issued by the Financial Accounting Standards Board (FASB).

[3] Employee pension benefits can include participation in defined 
benefit and defined contribution plans; however, we use the term 
pension benefits to refer to defined benefit pension benefits in this 
report. For information on the differences between defined benefit and 
defined contribution pension plans, please see U.S. General Accounting 
Office, Answers to Key Questions About Private Pension Plans, GAO-02-
745SP (Washington, D.C.: Sept. 18, 2002), 8-11.

[4] In general, postretirement health benefits can include medical, 
disability, and life insurance coverage. However, the majority of DOE 
contractor postretirement costs are for retiree medical benefits; 
therefore, we refer to these benefits as postretirement health benefits 
in this report.

[5] The FAR provides that if the compensation costs are established 
pursuant to an "arms length" labor management agreement negotiated 
pursuant to the Federal Labor Relations Act or similar state statute 
and are otherwise allowable, they are reasonable unless, as applied to 
the work in performing government contracts, they are determined to be 
unwarranted based on criteria specified in the regulation. See 48 
C.F.R. § 31.205-6(b)(1) (2003). In addition, the FAR provides that if 
employee compensation costs are not covered by labor-management 
agreements, the compensation for each employee or job class of 
employees must be reasonable for the work performed and is reasonable 
if the aggregate of each measurable and allowable element sums to a 
reasonable total. Factors that may be relevant to this determination 
include, but are not limited to, conformity with compensation practices 
of other firms: (1) of the same size, (2) in the same industry, (3) in 
the same geographic region, and (4) engaged in similar nongovernment 
work under comparable circumstances. See 48 C.F.R. § 31.205-6(b)(2). 

[6] See app. I for a complete list of DOE contractor locations that had 
recorded financial accounting liabilities for contractor employee 
benefits as of September 30, 2003.

[7] Section 1013(a) of ERISA, Pub. L. No. 93-406, 88 Stat. 829, 914, 
added section 412 to the Internal Revenue Code of 1954, which appears 
at 26 U.S.C. § 412. Section 412 establishes minimum funding 
requirements for private sector defined benefit pension plans designed 
to ensure that these plans will have sufficient assets to pay the 
accrued benefits of participants upon retirement. The minimum funding 
rules generally require plan sponsors to contribute an annual amount to 
cover the following: (1) actuarial present value of benefits attributed 
by the pension benefit formula to services rendered during the plan 
year, (2) amortization of past service costs, and (3) amortization of 
increases in pension liabilities and experience losses. ERISA also 
establishes a maximum tax-deductible limit on the required contribution 
in 26 U.S.C. § 412(c)(7). 

[8] Under a pay-as-you-go method, DOE only reimburses contractors for 
the funds needed to meet the premium costs of current retirees' 
benefits. This method can be contrasted with an accrual basis funding 
method, which funds estimated amounts of future payments needed to 
cover benefits earned during the current period. According to DOE 
officials, one DOE contractor does fund postretirement health benefits 
on an accrual-funding basis, as defined and allowed by applicable 
regulations.

[9] This exchange is consistent with the provisions of SFAS No. 87, 
Employers' Accounting for Pensions, and SFAS No. 106, Employers' 
Accounting for Postretirement Benefits Other Than Pensions.

[10] Compensation programs and costs discussed in DOE Order 350.1 
include employee salaries, other cash and noncash compensation, and 
employee benefits programs. 

[11] Contractor benefit programs, or contractor benefits, as used in 
this report, includes all major nonstatutory benefit programs offered 
by the contractor, such as postretirement health and pension benefits. 
Contractor benefits, as used in this report, exclude statutory 
benefits, such as Social Security benefits, and contractor employee 
compensation, which are evaluated separately by DOE.

[12] Replacement value, in this context, indicates the amount of money 
an employee would need to spend or invest in order to duplicate the 
benefits provided by the employer.

[13] U.S. General Accounting Office, Standards for Internal Control in 
the Federal Government, GAO/AIMD-00-21.3.1 (Washington, D.C.: November 
1999).

[14] U.S. General Accounting Office, Internal Control Management and 
Evaluation Tool, GAO-01-1008G (Washington, D.C.: August 2001).

[15] The unfunded balance of $13.4 billion differs from the financial 
liability of $9.8 billion presented in the Consolidated Balance Sheet 
of DOE's fiscal year 2003 Performance and Accountability Report. The 
unfunded balance of $13.4 billion equals the financial liability of 
$9.8 billion plus $3.6 billion in net losses incurred but not required 
to be recorded until future periods and other adjustments as prescribed 
by SFAS No. 87, Employers' Accounting for Pensions, and SFAS No. 106, 
Employers' Accounting for Postretirement Benefits Other Than Pensions.

[16] DOE calculates liabilities for contractor pension and 
postretirement health benefits according to the methodology established 
by FASB, which promulgates accounting rules for private sector 
enterprises. DOE's costs under its commercial contracts include the 
reimbursement of annual contractor employee benefits, and therefore DOE 
records these obligations as if it were the plan sponsor.

[17] Actuarial calculations for postretirement benefits involve the 
determination of the value, as of a specified date, of a series of 
future amounts payable, adjusted to reflect the time value of money 
(through discounts for interest) and the probability of payment (for 
example, by means of decrements for events such as death, disability, 
or withdrawal from a plan) between the specified date and the expected 
date of payment.

[18] Financial liabilities for postretirement health and pension 
obligations are estimated using the present value of future expected 
benefit payments. When assigning postretirement benefit costs to more 
than one financial statement period, interest costs are incurred due to 
the passage of time. The rate used to calculate the interest costs, and 
therefore adjust outstanding obligations for the time value of money, 
is called the discount rate. Decreases in the discount rate result in 
increases in annual financial statement benefits costs.

[19] 26 U.S.C. § 412.

[20] Favorable benefit experience can be defined as differences between 
estimates of benefits earned to date by current and retired employees 
and the actual postretirement benefits paid to those employees in the 
future. Favorable benefit experience may also include the negotiated 
settlement of benefit obligations with contractors for amounts less 
than the estimated accounting obligations as measured by FASB 
standards.

[21] The total settlement costs for each contractor pension plan 
consist of the unfunded benefit obligation at the contract termination 
date, the reimbursement of excise taxes paid by the contractor to 
terminate the plan, and any additional costs or fees associated with 
the purchase of insurance contracts to satisfy future payments to 
employees. Contractor benefit plans that are overfunded at the 
settlement date could result in the reversion of excess funds to DOE 
after all costs are paid to satisfy the estimated benefit obligations.

[22] The term "corporate plan" is used within DOE Order 350.1 to 
indicate the participation of DOE contractor employees in a 
contractor's companywide benefits program. Contractors providing 
corporate plan benefits are subject to the provisions of DOE Order 
350.1; however, they are specifically exempted from the comparison 
study requirements. 

[23] Although the majority of DOE contracts at environmental cleanup 
and research sites are for primary cleanup and research missions, 
called management and operating contracts, some contracts at these 
sites are support services contracts. Support services refer to those 
activities that are not fundamental to the environmental cleanup and 
research operations, including facilities management, security, and 
health services. These contracts are generally smaller in size and 
scope and were separated from larger management and operating contracts 
in order to provide opportunities for smaller businesses.

[24] The Value Study Desk Manual was prepared for DOE by Buck 
Consultants, Inc., and issued in February 1999. The manual is 
distributed to all DOE contracting officers and contains recommended 
procedures for completing DOE benefit value studies. Policies and 
procedures for the completion of both the benefit value studies and the 
Chamber of Commerce cost studies are also found in DOE Order 350.1. 

[25] These tests were conducted for 18 of the 21 contractor sites 
because the Value Study Desk Manual recommended procedure to obtain 
contractor and actuarial certifications and maintain documentation for 
comparator companies outside of the contractor's industry are not 
applicable to the 3 contractor sites that completed Chamber of Commerce 
cost studies.

[26] See footnote 25.

[27] The Value Study Desk Manual recommends that all companies selected 
as comparators for the benefit value study should compete for 
professional staff in the same "industry" or the contractor should 
provide documentation that they have gained or lost professional staff 
to the comparator firm within recent years.

[28] DOD generally maintains a shorter duration of individual 
contractor operations and contractor employees usually participate in 
existing corporate plans and are not separated from non-DOD contract 
operations. This results in an increased need to review the allocation 
of employee costs, including benefit costs, between DOD and non-DOD 
contracts. See app. II for further comparisons between DOE and DOD 
contractor benefit reimbursement programs.

[29] Federal agencies subject to the FAR provisions may supplement the 
regulations through separately issued requirements for agency 
contractors. Both DOE and DOD have issued agency supplements to the 
FAR. 

[30] These differences in annual postretirement benefit payments and 
service costs can occur because the number of current employees earning 
benefits and the cost of those benefits in any given year may not equal 
the number of retirees receiving postretirement benefits and the cost 
of those benefits. Differences can also occur because pension 
contribution amounts required under ERISA may not equal the estimated 
benefits earned by employees. 

[31] DOE operations sites that include more than one contractor have 
been counted as one location for purposes of this report when the 
contractor benefits for multiple contractors are included in the same 
DOE Order 350.1 comparison study.

[32] The obligation for postretirement benefits at this contractor site 
was liquidated through a negotiated settlement in February 2004.

[33] See footnote 1.

GAO's Mission:

The General Accounting Office, the investigative arm of Congress, 
exists to support Congress in meeting its constitutional 
responsibilities and to help improve the performance and accountability 
of the federal government for the American people. GAO examines the use 
of public funds; evaluates federal programs and policies; and provides 
analyses, recommendations, and other assistance to help Congress make 
informed oversight, policy, and funding decisions. GAO's commitment to 
good government is reflected in its core values of accountability, 
integrity, and reliability.

Obtaining Copies of GAO Reports and Testimony:

The fastest and easiest way to obtain copies of GAO documents at no 
cost is through the Internet. GAO's Web site ( www.gao.gov ) contains 
abstracts and full-text files of current reports and testimony and an 
expanding archive of older products. The Web site features a search 
engine to help you locate documents using key words and phrases. You 
can print these documents in their entirety, including charts and other 
graphics.

Each day, GAO issues a list of newly released reports, testimony, and 
correspondence. GAO posts this list, known as "Today's Reports," on its 
Web site daily. The list contains links to the full-text document 
files. To have GAO e-mail this list to you every afternoon, go to 
www.gao.gov and select "Subscribe to e-mail alerts" under the "Order 
GAO Products" heading.

Order by Mail or Phone:

The first copy of each printed report is free. Additional copies are $2 
each. A check or money order should be made out to the Superintendent 
of Documents. GAO also accepts VISA and Mastercard. Orders for 100 or 
more copies mailed to a single address are discounted 25 percent. 
Orders should be sent to:

U.S. General Accounting Office

441 G Street NW,

Room LM Washington,

D.C. 20548:

To order by Phone: 

 Voice: (202) 512-6000:

 TDD: (202) 512-2537:

 Fax: (202) 512-6061:

To Report Fraud, Waste, and Abuse in Federal Programs:

Contact:

Web site: www.gao.gov/fraudnet/fraudnet.htm E-mail: fraudnet@gao.gov

Automated answering system: (800) 424-5454 or (202) 512-7470:

Public Affairs:

Jeff Nelligan, managing director, NelliganJ@gao.gov (202) 512-4800 U.S.

General Accounting Office, 441 G Street NW, Room 7149 Washington, D.C.

20548: